Perforator PNKT-5 was Introduced to the Standard of TNK-BP
| Perforator PNKT-5, supplied by Petros Group to included to the standard of TNK-BP as essential equipment for well reparation. During operation of oil wells sand, resin and paraffin plugs are formed in oil-well tubing. Because of these plugs hydrodynamic connection between tube and annular space is broken. It is essential to restore the hydrodynamic connection during well reparation to avoid spillage of liquid on surface and violation of environmental conditions. Hydromechanical perforator PNKT-5, supplied by Petros Group, should be used for these purposes. |







